another recent project:
first day of the build
basic
PVC overflow. i made it with 3/4" PVC because im doing a low flow system
sealed with pvc glue and painted with krylon fusion.
here are the overflow and return pipes

first test:
after it cured, i connected all the overflow and return pipes, and hung it on the tank to test for flow and leaks.
i didnt install the bio-tower yet. i just wanted to do a wet run on the pipe and pump.
at this point, i still hadnt installed the check valve on the overflow either.
seems to be working fine. (with the exception of the check valve)
installed the bio- tower, and filled it with media.
installed the check valve
ran the pipes behind the tank, and under the tank for wet test #2:
